New Da Nang airport’s terminal for visitors

airport-diamond-sea-hotel-in-da-nang
Construction of a new terminal at the Da Nang International Airport began Sunday to ease the burden on the lone existing terminal that is expected to be overloaded soon.
The terminal, expected to cost VND3.5 trillion (US$158 million), is slated for completion by March 2017 before the 25th Asia-Pacific Economic Cooperation (APEC) forum to be held later that year.
The 44,000sq.m, two-storey terminal, with a capacity of four million passengers a year, will exclusively serve international flights.
The existing terminal, which serves both domestic and international flights now, will then become domestic.
Designed to handle six million passengers a year, the existing terminal was commissioned in late 2011.
Last year five million passengers passed through the airport, a 16 percent rise from 2013.
With a 15 percent annual growth rate in passenger numbers, the existing terminal would be overloaded soon, Le Manh Hung, head of the Airports Corporation of Vietnam, said earlier this year.
Sources:
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s